A large pharmaceutical company in New Jersey needed to coordinate their perimeter heating elements with their VAV boxes since they were not integrated. The heating elements needed to be completely rewired to successfully integrate their controls and eliminate heating and cooling energy waste.
The graphics also needed to be updated to match the new BAS along with the building plans.
The entire operation was smooth sailing. Our team was able to disambiguate over 1,000 BAS points, upgrade the graphics, upgrade the firmware on central AHUs, and streamline HVAC operational logic.
The client now has a friendlier BAS user interface and reduced energy costs.