Our Past Projects

Chiller Plant Controls Optimization

Novartis was looking to evaluate and improve the performance of their new, fully-automated chiller plant. Enica started by collecting the appropriate data so they could develop equally appropriate energy conservation measures.

The next step was to download the code in order to evaluate and modify it. The code was changed to show how the energy conservation measures would be implemented. Enica worked with the contractor to implement the new code, line-by-line, to ensure that there were no interruptions to plant operations during the process.

Amazingly, Enica was able to give the plant an annual energy savings of 25%. There was also a substantial drop in operational issues, which improve the overall reliability of the plant.

Let Enica Help You

CONTACT US