Our Past Projects

BAS Upgrades

Novartis needed to correlate their heating elements with their VAV boxes since they were not integrated. The heating elements needed to be completely rewired to save on energy costs.

The graphics also needed to be updated to match the new BAS system along with the building plans.

The entire operation was smooth sailing. Our team was able to disambiguate over 1,000 BAS points, upgrade the graphics, upgrade the firmware on central AHU’s, and streamline HVAC operation logic.  

Novartis now has a friendlier BAS user system that reduces their cooling and heating waste.

Let Enica Help You

CONTACT US